This section is to help you with the installation of your InLine Fabrication LED lighting kits. 

 

 

Dillon 650 Ceiling kit install and wire routing:

 

 

Dillon 650 "Skylight" kit install and wire routing:

 

 

Dillon 550 LED placement (If using 4" strip.)

Proper placement of the LED is important to clear the indexing star.  Do a "Dry run" to check for clearance before sticking it for good. (It should almost touch the powder return bracket.

Skylight: drop pod into center hole of toolhead, run cable off the back of the press.

  

 

 

 

Hornady LNL AP. Skylight Kit.

  

 

 

 

Forster Co Ax Shellholder lighting system.

 Routing out the back side. (Make sure to route the wires low enough to avoid getting pinched as the press actuates.)